» » Tipper - The Critical Path

Tipper - The Critical Path mp3

Tracklist

1Seldom Vile5:12
2Sort Code5:45
3Twister4:49
4L.E.D Down
Lyrics By – TipperVocals – Sophie Barker
4:37

Versions

CategoryArtistTitle (Format)LabelCategoryCountryYear
HGCD29Tipper The Critical Path ‎(CD, Promo, Smplr)Higher GroundHGCD29UK1999

Credits

  • Arranged By [Strings]Noel Vine (tracks: B1), Tipper (tracks: B1)
  • ArtworkThe Designers Republic
  • Artwork [Airbrush Art]Adrian Chestermann
  • StringsCity Strings Orchestra (tracks: B1)
  • Written-By, ProducerTipper

Notes

Promotional sampler for The Critical Path album.
Not for resale.

33 ⅓ RPM printed on labels, but this release plays at 45 RPM.

Sony Music Entertainment (UK) Ltd decline any responsibility for loss, damage or death as a result of exploiting this Tipper production.

Original sound recording made by Sony Music Entertainment (UK) Ltd. The copyright in the sound recording is owned by Sony Music Entertainment (UK) Ltd. ℗ 1999 Sony Music Entertainment (UK) Ltd. © 1999 Sony Music Entertainment (UK) Ltd.

Barcodes

  • Matrix / Runout (Side A, etched): HG 039 A1 FSV
  • Matrix / Runout (Side B, etched): HG 039 B FSV
  • Matrix / Runout (Side C, etched): HG 039 C FSV
  • Matrix / Runout (Side D, etched): HG 039 D1 FSV
  • Rights Society: MCPS/BIEM/SDRM

Companies

  • Phonographic Copyright (p) – Sony Music Entertainment (UK) Ltd.
  • Copyright (c) – Sony Music Entertainment (UK) Ltd.
  • Published By – Chrysalis Music Ltd.
  • Pressed By – FSV

Info

The Critical Path it's the first official release by David Tipper. Tipper's sound is as distinctive as your mum's voice , It's the continual pops Seldom Vile 2 Twister 3 Down 4 Dissolve In 5 Dissolve Out 6 Supersport 7 Sort Code 8 Cable To Continue 9 Night Vision 10 Last Informer 11. 1 Glitch. Songs in album Tipper - The Critical Path 2000. Tipper - Seldom Vile. Tipper - Twister. Tipper - Down. Tipper - Dissolve In. Tipper - Dissolve Out. Update Required To play the media you will need to either update your browser to a recent version or update your Flash plugin. The Critical Path. Show all albums by Tipper. Benji Robot. Live Tipper & Friends - New Orleans - . Use shift and the arrow up and down keys to change the volume. Addictech Records. Current track: Weavil CakeWeavil Cake. The Critical Path CD, Album. Higher Ground, Higher Ground. HIGH9CD, 4946852000. Tipper produces here a record which does what many attempt but fail to do: true merging of multiple genres into one - the absolute symphonic beauty of 'Dissolve In' disrupted by the disgustingly rude drums and deep bass yet still retaining that beauty. The merging of deep, depressing and yet soulful lyrics on '. Down' & 'Dissolve Out' with the most evil breakbeats and bowel-moving bass and making it sound better then amazing. Listen free to Tipper The Critical Path Supersport. 1 track 3:43. Or consider a donation . Album by Tipper. Seldom Vile. Dissolve In. Dissolve Out. Sort Code. Cable To Continue. Night Vision. Last Informer. On Condition The Condition. search for Tipper , The Critical Path

Tipper - The Critical Path mp3

Performer: Tipper

Title: The Critical Path

Country: UK

Release date: 1999

Label: Higher Ground

Style: Breaks

Catalog: HG 039

Genre: Electronic

Size MP3: 2479 mb

Rating: 4.9 / 5

Votes: 097

Record source: 2 × Vinyl, 12", 45 RPM, Promo

MP3 Related to Tipper - The Critical Path